Overview
The Trail project on S.R. A1A from S.R. 206 to A1A Beach Blvd is in the initial design phase with survey activities underway. The trail will be constructed on the east side of S.R. A1A replacing the existing sidewalk. The trail will cross S.R. A1A at the signalized intersection at S.R. 206. Construction is scheduled for Fall 2028. Please see “documents” tab for latest roll plot.
Project Photos
No photos at this time.
No Events at this time.