Beaver Street (U.S. 90) Resurfacing from Edgewood Avenue to McCargo Street
Overview

Preferred Materials, Inc. was awarded the contract to complete this $7.5 million project, which includes milling and resurfacing the roadway as well as base work, shoulder treatment, drainage improvements, traffic signals, highway signing, guardrail, sidewalks/bicycle paths, polyurethane injection, lighting utility work and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6:30 a.m. to 6:30 p.m. and no lane closures will be allowed within 600 feet of a signalized intersection from 6:30 a.m. to 7:30 p.m.

Traffic Impacts
Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:August 2024
Expected Completion:Fall 2025
Cost:$7.5 million
Project #:445354-1
RoadsU.S. 90
CountiesDuval
CitiesJacksonville
Contact
Photo of Sara PleasantsSara Pleasants
386-269-3490
Beaver Street (U.S. 90) Resurfacing from Edgewood Avenue to McCargo Street
Overview

Preferred Materials, Inc. was awarded the contract to complete this $7.5 million project, which includes milling and resurfacing the roadway as well as base work, shoulder treatment, drainage improvements, traffic signals, highway signing, guardrail, sidewalks/bicycle paths, polyurethane injection, lighting utility work and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6:30 a.m. to 6:30 p.m. and no lane closures will be allowed within 600 feet of a signalized intersection from 6:30 a.m. to 7:30 p.m.

Project Details
Project Start:August 2024
Expected Completion:Fall 2025
Cost:$7.5 million
Project #:445354-1
RoadsU.S. 90
CountiesDuval
CitiesJacksonville
Contact
Photo of Sara PleasantsSara Pleasants
386-269-3490
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable