Preferred Materials, Inc. was awarded the contract to complete this $7.5 million project, which includes milling and resurfacing the roadway as well as base work, shoulder treatment, drainage improvements, traffic signals, highway signing, guardrail, sidewalks/bicycle paths, polyurethane injection, lighting utility work and other incidental construction.
Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6:30 a.m. to 6:30 p.m. and no lane closures will be allowed within 600 feet of a signalized intersection from 6:30 a.m. to 7:30 p.m.