Drayton Island Ferry Landing Project
Overview

The Drayton Island Ferry Landing project will replace the structurally deficient ferry landings (Bridge Nos 764040, 764041) with economical, long-lasting, and environmentally sound structures. The existing landings currently consist of timber pile structures that were originally constructed in 1939 and rebuilt in 1990.

Based on the capacity and conditions of the landings, the size and weight of the vehicles is limited that can currently access the island, including emergency and construction vehicles, is restricted. In addition to upgrading the landings, modifications and improvements to the existing roadway approaches will also be included in this contract.

The new landings will be constructed adjacent to the existing timber structures to allow existing ferry access to be maintained for the island residents during construction.

This construction sequence avoids the need of temporary structures thus resulting in lower project costs and reduced impacts to this sensitive and unique environment.

The construction time frame is about 9 months to a year, but there are several variables we are unable to account for such as bad weather delays, tidal Influences and water current, and wind. The boat launch will be unusable for the entire time the mainland landing is being constructed.

FAQ

  • Closure of the Boat Ramp — The existing boat ramp will be closed soon after construction begins since the new landing will be located in the area of the existing ramp. A new boat ramp will be constructed adjacent to the new landing, though the ramp will not be operational until construction of the entire project is completed.
  • Closures of the Ferry — The project has been designed to allow the existing landings and ferry traffic to remain operational throughout most of the project.
  • Improvements in the Area — New concrete bridges will be built to serve as permanent landings along with new fender systems, roadway, and drainage improvements.
  • Weight Capacity of the Landings and Accommodations of Vehicles — The new landing bridges will allow vehicles weighing up to 72,000 lb. to be accommodated.
Traffic Impacts
Project Photos
No photos at this time.
Project Documents
Newsletter
No Events at this time.
Project Details
Project Start:December 2021
Expected Completion:Late 2022
Cost:$3.1 million
Project #:437418-1
Roads
CountiesPutnam
Cities
Contact
Photo of Jacob PickeringJacob Pickering
904-360-5471
Drayton Island Ferry Landing Project
Overview

The Drayton Island Ferry Landing project will replace the structurally deficient ferry landings (Bridge Nos 764040, 764041) with economical, long-lasting, and environmentally sound structures. The existing landings currently consist of timber pile structures that were originally constructed in 1939 and rebuilt in 1990.

Based on the capacity and conditions of the landings, the size and weight of the vehicles is limited that can currently access the island, including emergency and construction vehicles, is restricted. In addition to upgrading the landings, modifications and improvements to the existing roadway approaches will also be included in this contract.

The new landings will be constructed adjacent to the existing timber structures to allow existing ferry access to be maintained for the island residents during construction.

This construction sequence avoids the need of temporary structures thus resulting in lower project costs and reduced impacts to this sensitive and unique environment.

The construction time frame is about 9 months to a year, but there are several variables we are unable to account for such as bad weather delays, tidal Influences and water current, and wind. The boat launch will be unusable for the entire time the mainland landing is being constructed.

FAQ

  • Closure of the Boat Ramp — The existing boat ramp will be closed soon after construction begins since the new landing will be located in the area of the existing ramp. A new boat ramp will be constructed adjacent to the new landing, though the ramp will not be operational until construction of the entire project is completed.
  • Closures of the Ferry — The project has been designed to allow the existing landings and ferry traffic to remain operational throughout most of the project.
  • Improvements in the Area — New concrete bridges will be built to serve as permanent landings along with new fender systems, roadway, and drainage improvements.
  • Weight Capacity of the Landings and Accommodations of Vehicles — The new landing bridges will allow vehicles weighing up to 72,000 lb. to be accommodated.
Project Details
Project Start:December 2021
Expected Completion:Late 2022
Cost:$3.1 million
Project #:437418-1
Roads
CountiesPutnam
Cities
Contact
Photo of Jacob PickeringJacob Pickering
904-360-5471
Project Documents
Newsletter
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)