103rd Street (State Road 134) from Samaritan Way to Shindler Drive resurfacing
Overview

Duval Asphalt Products, Inc. was selected to complete this $8.8 million project, which consists of milling and resurfacing, base work, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5 a.m. to 9 p.m. Monday through Sunday. No lane closures will be allowed from 3:30 p.m. to 6:30 p.m. within 600 feet of a signalized intersection Monday through Sunday.

Traffic Impacts
Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:Summer 2025
Expected Completion:Fall 2026
Cost:$8.8 million
Project #:209692-6
RoadsState Road 134
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
103rd Street (State Road 134) from Samaritan Way to Shindler Drive resurfacing
Overview

Duval Asphalt Products, Inc. was selected to complete this $8.8 million project, which consists of milling and resurfacing, base work, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5 a.m. to 9 p.m. Monday through Sunday. No lane closures will be allowed from 3:30 p.m. to 6:30 p.m. within 600 feet of a signalized intersection Monday through Sunday.

Project Details
Project Start:Summer 2025
Expected Completion:Fall 2026
Cost:$8.8 million
Project #:209692-6
RoadsState Road 134
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable