Duval Asphalt Products, Inc. was selected to complete this $8.8 million project, which consists of milling and resurfacing, base work, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk work, and other incidental construction.
Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5 a.m. to 9 p.m. Monday through Sunday. No lane closures will be allowed from 3:30 p.m. to 6:30 p.m. within 600 feet of a signalized intersection Monday through Sunday.