U.S. 17 from North of Broward River to Nassau County Line Resurfacing
Overview

Preferred Materials, Inc. was selected to complete this project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, subsoil stabilization, highway signing installation, guardrail work, bridge repairs, sidewalk and bicycle work and other incidental instruction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5:30 a.m. to 9 p.m. No lane closures will be allowed within 600 feet of a signalized intersection from 5:30 a.m. to 9 p.m.

Traffic Impacts
Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:Summer 2025
Expected Completion:Spring 2026
Cost:$13.2 million
Project #:209573-3
RoadsState Road 5, U.S. 17
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
U.S. 17 from North of Broward River to Nassau County Line Resurfacing
Overview

Preferred Materials, Inc. was selected to complete this project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, subsoil stabilization, highway signing installation, guardrail work, bridge repairs, sidewalk and bicycle work and other incidental instruction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5:30 a.m. to 9 p.m. No lane closures will be allowed within 600 feet of a signalized intersection from 5:30 a.m. to 9 p.m.

Project Details
Project Start:Summer 2025
Expected Completion:Spring 2026
Cost:$13.2 million
Project #:209573-3
RoadsState Road 5, U.S. 17
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable