Preferred Materials, Inc. was selected to complete this project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, subsoil stabilization, highway signing installation, guardrail work, bridge repairs, sidewalk and bicycle work and other incidental instruction.
Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 5:30 a.m. to 9 p.m. No lane closures will be allowed within 600 feet of a signalized intersection from 5:30 a.m. to 9 p.m.