Location:
Community Full Gospel Church
12664 Mud Lake Road
Glenn St. Mary, FL 32040
Doors Open: 4:00 — 6 :00 p.m.—Drop by anytime to review project displays and talk with Department staff.
For More Information Contact:
Aja Stoppe, Project Manager
FL Dept. of Transportation
1109 S. Marion Avenue, MS 2007
Lake City, FL 32025
Phone: (386) 961-7521 or (800) 749-2967
Email:
aja.stoppe@dot.state.fl.us
The Florida Department of Transportation (FDOT) will be hold a public meeting to discuss the proposed bridge replacement of two bridges on
Clet Harvey Road in Baker County, Florida. The two projects are:
The FDOT is currently conducting a Project Development & Environment (PD&E) Study to replace the Clet Harvey Road Bridge over Turkey Creek and the bridge over Mud Lake Swamp.
The proposed improvements recommend replacing the existing one lane timber bridge with a one lane concrete bridge.
The FDOT is proposing to start construction with the Mud Lake Swamp bridge and then move to the Turkey Creek bridge. Both bridges will not be closed at the same time.
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the FDOT
pursuant to 23 U.S.C.§ 327 and a Memorandum of Understanding dated March 14, 2016 and executed by the Federal Highway Administration and FDOT.